Number of Block : 2
Total Construction Area: 2.500m2
Location: Erenler / Sakarya
Year of Construction: 2013
In accordance with the drawings and designs prepared by Kia Company, all work items were completed on time and delivered on a turnkey basis.
All reinforced concrete works, steel construction works, Aluminum facade works, indoor works have been completed without any problems on a turnkey basis and presented to the use of the customer.